So excited to see your vision come to life!

Expand full comment
JamesMc's avatar

Good luck. I did a kitchen and a bathroom and yes it was too much but it eventually got done.

An order of operations step can be found here: https://blog.lostartpress.com/2024/01/30/kitchen-renovation-getting-started-order-of-work/

Generally I would do rough framing and then plumbing because there can be some large pipes that aren't flexible in their placement. Then HVAC if you're doing that, then electrical which can be worked around the other items.

So yes, rough framing I would do next, just keep in mind where your devices and fixtures and penetrations will go. Some walls may benefit from being 2x6 to have more space inside for utilities.

How high is your ceiling? I want to renovate my basement but the 7 foot high ceiling is limiting.